Q CELLS Q.FLAT-G5 - Mounting Solution for solar modules on flat roofs
- Buy 10 for €43,38 each and save 10%
- Product description
- Q.Mount for pitches roofs
- Q.Cell G4
- Q.Cell G5 for flatroofs
-
Q.Flat-G5 basic profile DUO (G6 / G8) incl. building protection mat with aluminum lamination for foil roof
-
Q.Flat-G5 ballast carrier DUO (G6/G8), 1693mm
- Q.Flat-G5 end clamp klemme pre-assembled
- Q.Flat-G5 basic profile DUO (G6 / G8) incl. building protection mat without aluminum lamination for bitumen roofs
- Q.Flat-G5 ballast carrier DUO (G6/G8), 1693mm
- Q.Flat-G5 end clamp pre-assembled
- Q.Flat-G5 basic profile DUO (G4/G5/G7) incl. building protection mat with aluminum lamination for foil roof
- Q.Flat-G5 ballast carrier DUO (G6/G8), 1638mm
- Q.Flat-G5 end clamp pre-assembled
- Q.Flat-G5 basic profile DUO (G4/G5/G7) incl. building protection mat without aluminum lamination for bitumen roofs
- Q.Flat-G5 ballast carrier DUO (G4/G5/G7), 1638mm
- Q.Flat-G5 end clamp pre-assembled
- Reviews
- Shipping & returns
Q.Cells Montage Systeme
Several mounting systems are available from Q.Cells for different applications on roofs
Only two general preparations are necessary for the detailled preparations for assembling the Q.Cells System G5. The assembly is done in just four steps with little effort
Preparation Step 1
1.1 Planning of the system with Q.Cells Rooftop Planner
1.2 Mounting plan for the solar modules
1.3 Connection Plan for the modules
1.4 Selection of the Inverter according to the project
1.5 Cable layout
1.6 Plan and design of the additional ballast
Preparation step 2
2.1 Prparing the documentation
2.2 Report of the structural design in consideration of the loads of winfd and snow
2.3 Profatibility calculation
2.4 Bill of material
Simple and easy mounting of Q.Cells G5 mounting system
The Q.Cell G5 System is easily erected on a suitable flat roof.
Step 1 The pre-assembled basic profiles (including building protection mat and central support) are laid out on the roof and the central supports is simply unfolded. The hinge of the folding mechanism is fixed in the end position by applying slight pressure. Fastening to the roof is not necessary, which protects the building fabric and significantly reduces installation costs. |
![]() |
Step 2 The basic profiles are aligned on the roof and the ballast carriers are attached. The ballast can already be placed according to the ballast plan. |
![]() |
Step 3 The Q CELLS solar modules are only pushed into the central support and placed in the end clamp without having to be attached with a clamp.
|
![]() |
Step 4 The end clamp plate is put on and screwed tight. |
![]() |
Setvariants of the mounting material set Q.Flat G5 for Q.Cells modules G5 / G6 / G7 /G8
Set 1For Q.Peak DUO-G6 and Q.Peak DUO-G8 with 120 half cells for foiled roofs |
Components |
Set 2For Q.Peak DUO-G6 and Q.Peak DUO-G8 with 120 half cells for bitumen roofs |
Components |
Set 3For Q.Peak DUO-G5 and Q.Peak DUO-G7 with 120 half cells for foiled roofs |
Components |
Set 4Für Q.Peak DUO-G5 und Q.Peak DUO-G7 mit 120 Halbzellen für bitumen roofs |
Components |
Download
Download instruction for installation
- Related products